My photo
Complete solutions - Biomass Heating - Wind Turbine Technology - Solar Hot Water - PV Solar Systems - Heat Pumps - Pellet and Wood Stoves - Intelligent Heating Controls
Showing posts with label boiler. Show all posts
Showing posts with label boiler. Show all posts

Wednesday, 29 October 2014

Hargassner ECO-HK 60kW Boiler Install in Lisburn - Wood Chip Drying Facility

First in Ireland

A new Hargassner wood chip boiler installed to heat a farm house, outbuildings and wood chip drying facility in Lisburn, Northern Ireland. 

Installers Green Energy Technology were very impressed with the design and specifications of the ECO-HK. 

The boiler won the Austrian Energie Genie Innovation Award as a high quality product that is capable of providing cleaner, more efficient heat, than competitor boilers.

This is the first Hargassner ECO-HK in Ireland and Northern Ireland.

 The Hargassner ECO-HK is an extremely powerful, highly efficient boiler featuring a new energy saving eco-mode, a double rotary grate and the latest combustion technology, Eco-Control.

(ft.Above, The new Boiler fitted and working)


  1. New grate system - Double rotary grate
  2. Fire bed level monitoring
  3. Heat exchanger cleaning (also in 1. draught)
  4. Ash suction system for extended maintenance intervals, optionally
  5. New innovative ignition system: Just 300 W, without fan
  6. Integrated Touch control
  7. Bicameral rotary valve in Z-design
  8. EC-Exhaust fan with negative pressure monitoring
  9. Recirculation for agricultural fuels, optionally
  10. Integrated back end protection
  11. ECO - Room agitator system with just 0.18 kW (0.25 kW) motor
  12. Patented ash extraction system for fly- and grate ash
  13. No thermal discharge system necessary
  14. Emergency operation with wood logs possible
  15. Combustion chamber fully integrated in water
  16. Flame concentration jets for optimum post-combustion
Other Features

Energy-Saving: Speed controlled EC-exhaust fan with negative pressure monitoring a staple of the new ECO systems is that they force the entire system to consistently monitor what's going inside and outside of the boiler, to ensure that the perfect conditions are met, which means that they are highly efficient, indeed, coming with a significantly higher efficiency rate of up to 90%. Due to the systems programming it will always try and maintain this high standard and you can expect it to do so for as long as it is running.

Double Rotary Grate: The grate consists of two consecutive and stepped placed grates that are able to move independently depending on what exactly you'll be putting into the boiler to burn, be it wood pellets, wood chips or miscanthus. 

Lambda Sensor with Fuel Quality Detection: With this feature it doesn't matter what type of fuel is stored nor their state, for instance if you placed wood chips into the boiler that were damp and hard the lambda sensor will be able to detect that and regulate itself for maximum calorific value and the optimum fuel-air mixture. This will be done automatically without any need for manual input. 

Combustion-Ergonomics: The design of the combustion chamber has been scientifically investigated through simulation (computational fluid dynamics) and as a result is perfectly adapted.

Firebed Monitoring: Through the exact and contactless firebed-height monitoring system with sensors, the most effective combustion condition will be adjusted depending on what fuel quality is being detected, this means that the system will automatically ensure that it is working with the correct amount of heat output for optimum combustion values.

Options:

Integrated Back End Protection: Fast and easy assembly that is both compact and inexpensive to ensure that if anything does ever go wrong, you're protected and it will also limit the damage. 

Recirculation for Agricultural Fuels: In order to remove the clinker creation within the system, that might adversely affect your auger and delivery system, Hargassner offers this accessory. Due to the cooling of the firebed during combustion, the relatively low melting ash melting point of miscanthus can be undercut. The ash can easily be removed into the ash extraction auger.





The Smart Way

Lean back and enjoy!:
Hargassner’s Lambda Touch Tronic is characterized through a self-explanatory display and ultimate ease of operation.The whole heating system, starting with the combustion to the accumulator tanks, heating circuits and hot water tanks, is controlled. The system operates based on outside weather conditions and is therefore able to perform in the optimum heating output range. This saves energy and heating fuel!
(ft. Above, the new on screen eco-control smart technology)

Wednesday, 1 October 2014

NI Domestic Renewable Heating Incentive - For people considering or intending to apply

Advance Information

The Domestic RHI is not yet open however it will be launched by the end of the year. The NI Renewable Heat Incentive is a government financial incentive, you'll receive an initial upfront payment and then payments every 12 months for 7 years. This scheme is designed primarily with single homes in mind however anyone can benefit from the RHI payments for their home, all you'll require is an EPC or Energy Performance Certificate and this proves that your property is assessed as a domestic dwelling. You'll need this in order to apply for the NIRHI.

If the above doesn't apply for you, you'll need to take a look at non-domestic RHI. It's for renewable incentives designed around Industrial, Commercial or Public Premises. It also covers heating systems that heat more than one home, such as two houses or a block of flats.

Eligible Heating Systems

The eligible renewable heating system types for the Domestic RHI are:


  • Biomass Boilers*
  • Air Source Heat Pumps
  • Ground Source Heat Pumps
  • Solar Thermal Panels - Flat Plate or Evacuated Tube Only
*Biomass Boilers does include Biomass Stoves that are equipped with a boiler to provide heating through a wet radiator system. Initially this will include all types as accredited under MCS but the Stoves that do not use wood pellets will be under close review. Your system must be metered if you have a boiler or stove and also another system, like an oil boiler.


Check your product

It's not enough to just have one of the types of renewable heating systems that are eligible for the scheme. The make and model must also meet specific technical requirements, check your specific product is in the Product eligibility list. If it's not you need to contact your installer to discuss the next steps.

Northern Ireland Domestic RHI and Energy Efficiency

Because Renewable Heating Systems work best in a well insulated home, the Northern Ireland Domestic RHI wishes to encourage people to make their homes more energy efficient, Before applying to the Domestic RHI you must first:

  • Install loft and cavity wall insulation to current recommended standards. If it is not possible to do this, then you should submit evidence to us as part of your application. 
  • Get an updated EPC to verify your insulation and your renewable heat installation.
If you intend to apply

  • You must be the owner of an eligible heating system.
  • The property must be occupied as a dwelling.
  • Your renewable heating system must be MCS certified.
  • No part of the renewable heating system used to produce heat may be used before the first commissioning date. The date is on your MCS Certificate. Some parts may be exempt.
  • The heating system must have been first commissioned on or after 1st September 2010. The date is on your MCS certificate.
  • You must apply within 12 months of the commissioning date of the heating system, shown on the MCS certificate. The deadline is different if you installed your heating system before the scheme opened. You must apply within the first year, i.e. before 30 November 2015.
  • If you received RHPP (Renewable Heat Premium Payment), DetiNI will make contact with you, so you will not have to do anything.
  • If you received a public grant other than the RHPP you will not be eligible for the NIRHI.
  • To be eligible, you or the former owner must also have made a personal financial contribution to the purchase or installation costs.
Supplying Proof

Your installer will register your renewable heating system and give you the MCS Certificate, to apply you complete an application form found on NI Direct Energy Wise web page you will also need an MCS Installations Certificate and an EPC number. This is at the top of your certificate and is a 20 digit code e.g. 1234-5678-9101-1121-314. Ensure that your EPC includes an estimated Potential Energy Use including figures for heating, hot water and lighting.

Payment Information

For most, payments made on an estimation of your heating system's annual heat use. For Biomass and Heat Pump systems DetiNI take the heat load figure on the EPC. For Solar Thermal, DetiNI use a figure calculated from information on your MCS certificate. Some people will have to install meters and submit regular readings on which payments will be based. This includes, but is not limited to, those with a back-up heating system such as an oil boiler, and those with a property which is a second home.

The domestic RHI payments have two sections, one is an upfront payment to help with the costs on accreditation and an ongoing incentive in the form of annual payment for seven years. The upfront payment is dependant on what technology you're using and the ongoing payment is dependant on how much Energy you use in your home.

The upfront payments are as follows:
  • Biomass - £2500
  • Air Source Heat Pumps - £1700
  • Ground Source Heat Pumps - £3500
  • Solar Thermal -  £320
If you've already received support for under the RHPP you will receive the ongoing payment only. The ongoing payments are calculated by multiplying a tariff with the heat demand/use in your home. The current tariff rates (p/kWh) are as follows;
  • Biomass:                                 5.6 p/kWh
  • Air Source Heat Pump:         3.5 p/kWh
  • Ground Source Heat Pump: 8.2 p/kWh
  • Solar Thermal:                       13.5 p/kWh
Your Responsibilities

A condition of you joining the scheme is that you will abide by the scheme's rules. They include, but are not limited to:
  • Keeping the heating system and metering equipment in good working order
  • Telling DetiNI of the equipment breaks down and isn't working whilst waiting on repairs.
  • Telling DetiNI if you sell your house (with the heating system in it), in which case payments to you will stop and switch to the new owner, should they apply to the scheme and fill certain conditions.
  • Telling DetiNI if you make any changes to your heating system, for example, if you replace a part of it.
  • Telling DetiNI if there are changes that mean your property needs to be metered, for example if you purchase a second home.
  • Telling DetiNI if there is any change in circumstances, that may affect your eligibility to receive payments.
Audit Checks

To continue to receive payments, you'll have to complete an annual declaration confirming that you've kept to the rules. To help protect the public purse, DetiNI carry out a system of desk and site audits to verify that declarations are accurate. They're randomly chosen, so anyone may be selected at any time.

If you've received RHPP in the past when your boiler was installed then you will not be eligible for the subsidized up-front payment the RHPP was a one-off payment to help with covering some of the cost of the boiler. You will still be eligible for the seven year annual payment plan.

For all enquiries regarding NIRHI, call - 02890529219 or Email: NI.RHI@detini.gov.uk
For more information regarding NIRHI please see the following:

Friday, 19 September 2014

Hargassner Boiler Technology

Latest Combustion Technology – ECO Control

Lambda sensor with fuel quality detection
It doesn't matter which fuel type is stored – soft, dry or damp woodchips – the control unit uses the lambda sensor to detect the relevant calorific value and regulates the optimum fuelair mixture. This is how convenient controls work today – constant manual adjustment of the system to the fuel is a thing of the past.
As well as being environmentally friendly with ultra low energy consumption, the all new ECO HK has the ability to occasionally burn logs making it the most versatile boiler available today.

Combustion Ergonomics
The design of the combustion chamber has been scientifically investigated through CFD  - Simulation (Computational Fluid Dynamics) and as a result is perfectly adapted.

Firebed Monitoring
Through the exact and contact free firebed-height monitoring system with sensors, the most effective combustion condition dependant on fuel quality is detected. Your heating system is always working with the required heat output at optimum combustion values.

Fully refractory-lined high performance combustion chamber with flame concentration jets for optimum post-combustion

The refractory combustion chamber guarantees high combustion temperatures through optimum heat storage (also at part-load), which minimizes the ignition procedure and reduces emissions.


Accessories:
Integrated Back End Protection

An integrated back end protection with energy-efficient pump and motor mixer is available.
-          -Quick and easy assembly
-          -Compact and inexpensive


Recirculation for Agricultural Fuels

To reduce clinker creation in the ash, Hargassner offers a flue gas recirculation, especially for agricultural fuels. Due to the cooling of the firebed during combustion, the relatively low ash melting point of miscanthus or corn cobs can be undercut. The ash can easily be removed into the ash extraction auger.



Latest Touch-Control
(Integrated, Plug & Play)

The all new Lambda-Touch-Tronic leaves nothing to be desired. The control system is characterised through its exceptional design and simple handling. Navigation is very sophisticated. You visually recognise immediately the current status of the boiler, the accumulator and the HWS as well as all heating circuits. New optimized accumulator control with 3 sensors. New remote controls with LCD or Touch Displays make it even easier to use.


Perfect Cleaning – Increased Efficiency

The newly designed cleaning approach cleans ALL heat exchanger tubes at regular intervals – NEW – also the 1. Down-Drought is cleaned (Stainless Steel Turbulators) the turbulators remove the fly ash from the pipes, which directly falls down into the ash extraction auger. The result is easier cleaning and increased overall efficiency.


Fully Automatic Ash Extraction

Hargassner heating technology now brings you even more convenience: The latest de-ash system cleans the boiler at regular intervals. The ash extraction auger transports the fly ash, as well as the grate ash, into the completely integrated ash box. During the transport the ash is crushed and compressed in the ash box.


The all new ash suction system results in annual maintenance intervals

Optionally a 300 Litre Bin is available.
The suction system transports the ash through a steel pipe system from the boiler room into the ash bin, which is located at a roofed outdoor area. With a tractor or a front loader, the ash bin may be emptied once a year. Hargassner provides best ease of use – with superior and smart cleaning technology.


TYPE
Fuel-Dependant heat output in kW
Eco 20
6-20
Eco 30
9-30
Eco 35
10-35
Eco 40
12-40
Eco 49
15-49
Eco 60
18-60
Weight
490kg (630kg)
Voltage
400VAC, 50Hz, 13A
Dimensions HxWxD[mm]
1428x660x1271
(1428x745x1356)
Numbers in () are for 40-60Kw Boilers

Tuesday, 20 May 2014

Nursing home group goes Green

Spa Nursing Homes Limited converting four care homes to wood pellet fuel in 2014



Spa Nursing Homes selected Green Energy Technology Ltd., (GET) to convert their care homes from heating oil to wood pellet fuel. The first home has been completed, with GET installing an award winning Hargassner wood pellet boiler in a turn-key plant room at The Spa Nursing Home in county Down.




This 'GET Heat Module' is constructed off site, to minimise disruption at the nursing home. Once it is delivered to site, it can be connected to the building and provide heat within 2 days. During this time there is no interruption to the existing heating performance.

In addition to the nursing home in The Spa, GET will be converting homes in Crumlin, Carryduff and Ballynahinch from heating oil to wood pellets.


Externally the GET Heat Module is finished to a high standard, and is linked to a wood pellet silo. Any external pipework is insulated and protected.

The main driver for the installation of these systems at Spa Nursing Homes Limited is the Northern Ireland Renewable Heat Incentive (RHI). The RHI pays the owners of wood pellet boilers for every unit of heat the boiler generates, this is an incentive for switching from fossil fuels. Although there are no grants to assist with the capital costs, the quarterly incentive payments mean that these projects have a payback of 4 years or less.

Damien Phillips, Project Manager at GET, stated: 'The four nursing home conversions represent a large investment by the group, however, there is a relatively short payback due to the RHI. Looking at the longer term, using Hargassner boilers means we have a high-tech solution requiring minimal involvement by nursing home staff, and GET has the ability to monitor each boiler remotely.'


The Hargassner wood pellet boiler is integrated with a complete plant room package.

The RHI scheme lasts for 20 years, and payments are index linked. In addition to the financial benefits of switching to wood pellets, it also means the nursing homes will reduce their environmental impact and help support local jobs. All pellets will be sourced from the island of Ireland.

Chris Arnold, from Spa Nursing Homes Ltd., commented; 'Overall the experience of moving away from heating oil has been relatively straightforward. Once we examined the financials and the overall benefits, it was an easy decision to make. We wanted a quality installation, Hargassner and GET met our requirements. GET took care of everything, right through to claiming the RHI payments. We are looking forward to working with GET on the rest of our properties.'

Damien Phillips continued; 'With a twenty year government incentive it is important that a quality product is used. Hargassner boilers are design to last. They are tried and tested, and if properly maintained they will last well over 30 years'.

Green Energy Technology Ltd. are based in Waringstown, between Banbridge and Lurgan, and have a showroom open to the public with working models of all technologies. Their previous biomass heating projects include Castlewellan Castle, Moy Park Poultry farm, as well as factories, offices and accomodation.

For enquiries contact Damien on 02838881228 or damien(at)get-renewables.com

Wednesday, 15 August 2012

Green Heat Module from Wood Energy Ltd

 What is the Green Heat Module?

The Green Heat Module offers you the ultimate retro-fit solution to achieve low carbon heat with the minimum of fuss. Everything you need is included in the module so that we can arrive on site, hook up to your existing heating distribution system and fire you up!  Complete, turnkey, 'in the box' thinking from Green Energy Technology in partnership with industry leaders - Wood Energy Ltd - we have done the thinking so you don't have to!


The level of tariff is set from the date of registration but will be decreased as more organisations sign up, so to maximise the level of 20 year fixed tariff available to your project, you should act now.



If you've got a carbon-saving target or want to reduce your dependency on heating from fossil fuels - whether for cost or fuel security reasons, there's something new that you need to know.

Subject to the passage of appropriate legislation in autumn 2012, DETI will introduce the Northern Ireland Renewable Heat Incentive for the non-domestic sector. The Renewable Heat Incentive (RHI) is designed to accelerate the deployment of a number of technologies including biomass boilers. The RHI is a fixed, index-linked income paid to you for every unit of heat you generate from renewable sources over a 20 year period, protected and guaranteed by primary legislation.

Heat generated by the biomass boiler also means money off your existing heating bill.

The RHI scheme is aimed at all non-domestic applications and you will be paid quarterly by BACS for every kilowatt hour of heat produced by your new biomass boiler based on the meter readings you submit.

The Green Heat Module ranges from 15kW to 200kW with footprints ranging from the
equivalent of three to five parking spaces.


Pre-fabricated plant room includes:
  • Biomass boiler
  • Buffer tank
  • Heating circuit to accumulator tank
  • Hydraulic interface to clients heating main
  • Frost protection heating
  • Interior lighting
  • Ventilation
  • Flue
  • RHI compliant heat meter

Pre-fabricated fuel store includes:
  • Pellet extract auger
  • Fill & vent pipes
  • Earthing points for fuel tanker
  • Level observation windows
  • Explosion relief panels

Optional features:
  • Concrete base (optional) or ability to locate on a tarmac surface such as a car park
  • Civil works to connect into existing plant room including waterproofing

Get in touch with Green Energy Technology Ltd and see how our award winning range of Hargassner Boilers, and our Green Heat Module, can drastically reduce your fuel bills.