My photo
Complete solutions - Biomass Heating - Wind Turbine Technology - Solar Hot Water - PV Solar Systems - Heat Pumps - Pellet and Wood Stoves - Intelligent Heating Controls
Showing posts with label DetiNI. Show all posts
Showing posts with label DetiNI. Show all posts

Thursday, 9 October 2014

99kW Hargassner ECO-PK

Introducing the new 99kW Hargassner ECO-PK

New to the UK and Ireland in November 2014


Designed with efficiency and ease of use in mind, the 99kW Hargassner ECO-PK includes the latest biomass boiler technology available - the Hargassner ECO range of boilers won the 'Energy Genius' award from the Austrian Ministry of the Environment. 

www.hargassner.at Platzhalter-Grafik

If you are installing a 99kW in Northern Ireland, to avail of the government Renewable Heat Incentive (RHI), make sure you install a system that will last. The 20 year RHI is linked to the boiler itself - protect your payments and install a Hargassner.

Available across Ireland from Green Energy Technology Ltd. this cutting edge wood pellet boiler (and its wood chip version ECO-HK) has a substantial amount of unique, patented features. We estimate that these features, over the lifetime of the Renewable Heat Incentive, could save the owner over £4,000 in electrical running costs alone - compared to Hargassner competitors.


Schnittbild ECO PK


Double Rotary Grate (1)
The 'stage crusher grate' is the best method for cleaning the burning grate without disruption to combustion. During the combustion the grates are moved accurately, to ensure a homogeneous fire-bed. This double rotary grate is unique to Hargassner.



Firebed height monitoring system with sensors    (2)
Combined with a lambda sensor for fuel quality detection, resulting in the lowest carbon monoxide values, and lowest dust emissions. Hargassner boilers are UK Clean Air Act Exempt. Only Hargassner offer firebed level monitoring as standard.

Heat exchanger cleaning in the first pass   (3)
The Hargassner cleaning system cleans all areas where soot and fly ash can built up - even in the first pass (unlike the majority of competitor boilers). This mechanism creates a more efficient heat exchanger as the boiler is cleaner, and the gas flow is slower.

External soot collection   (4)
Option to add a large soot collector and increase emptying intervals

The silent energy saving ignition (5) only requires 300W, unlike other boiler ignitions which require over 1.3kW. 

Integrated touch controller    (6)
The 5.7” screen with touch controller allows the user to easily see the boiler status, and change settings. 


The EC exhaust gas fan (7) has up to 90% efficiency and is only available from Hargassner. Read more about the EC fan here: EC Exhaust Gas Fan

Flue gas re-circulation as standard    (8)
This helps control combustion temperatures and reduce NOx formation. It reduces the temperature of the grate to help prevent the formation of slag, and give a more even distribution of the fires heat. A cleaner and more complete combustion.

Integrated back-end protection   (9)
The pump, mixing valve and actuator needed to protect the boiler now comes integrated. This compact solution reduces the space required and speeds up installation time.

Patented ash and fly ash removal system   (10)
The ash extracting auger transports the fly ash and also the grate ash into the ash box. On the way to the ash box all the ash is compacted to a quarter of its volume - thereby saving space and lengthening emptying intervals.

No thermal safety valve required  (11) 
Speeding up installation time and cost

Combustion chamber surrounded by water  (12)
Maximum heat transfer and boiler control

Flame concentration jets out of high-end steel cast section   (13)

Double rotary valve dispenser (18) with cyclone suction system (14)
The unique double rotary valve allows continuous combustion even during pellet suction. The double valve provides a complete air lock between the combustion chamber and pellet hopper. The sound proofed suction system (15) with pellet level indicator (16) allows the end-user to place their wood pellet store up to 20 metres away. The suction system is closed and maintenance free (no filters).

Stainless steel stoker auger   (17)

One motor for everything
Boiler cleaning, fly ash transport, grate ash removal and ash transport to ash box is all handled by one drive motor. This is a single maintenance-free gear motor. This not only reduces the number of electrical components and increases operating reliability; it also saves on electrical consumption.

Hargassner App
Hargassner is the only manufacturer in this boiler class to have a dedicated and fully functioning iPhone and Android app to allow remote access. Other manufacturers produce apps that simply direct the user to a website. 

·         Switch circuits on/off and reduce temperature
·         Change heating times
·         Activate holiday mode
·         Status updates via notifications or email
·         Unlimited users
·         Worldwide access to heating system
·         Easy and intuitive

Fully refractory-lined combustion chamber
Hargassner boilers are fully refractory lined with high density bricks. Refractory has proven itself as the best material available in terms of heat storage, function and durability. The result is, even at partial loads, optimal combustion and fewer ignitions.

Negative pressure sensor to monitor under/over pressure events
Boilers without negative pressure monitoring cannot detect blockages in the heat exchanger. In addition, exhaust gas and combustion air fans do not speed up nor slow down in relation to the pressure inside the boiler - making other boilers less efficient. 

Standard warranty of 5 years, option to extend up to 10 years



Hargassner Video: http://youtu.be/0BELFxbP308


For futher information contact : Green Energy Technology Ltd


Wednesday, 1 October 2014

NI Domestic Renewable Heating Incentive - For people considering or intending to apply

Advance Information

The Domestic RHI is not yet open however it will be launched by the end of the year. The NI Renewable Heat Incentive is a government financial incentive, you'll receive an initial upfront payment and then payments every 12 months for 7 years. This scheme is designed primarily with single homes in mind however anyone can benefit from the RHI payments for their home, all you'll require is an EPC or Energy Performance Certificate and this proves that your property is assessed as a domestic dwelling. You'll need this in order to apply for the NIRHI.

If the above doesn't apply for you, you'll need to take a look at non-domestic RHI. It's for renewable incentives designed around Industrial, Commercial or Public Premises. It also covers heating systems that heat more than one home, such as two houses or a block of flats.

Eligible Heating Systems

The eligible renewable heating system types for the Domestic RHI are:


  • Biomass Boilers*
  • Air Source Heat Pumps
  • Ground Source Heat Pumps
  • Solar Thermal Panels - Flat Plate or Evacuated Tube Only
*Biomass Boilers does include Biomass Stoves that are equipped with a boiler to provide heating through a wet radiator system. Initially this will include all types as accredited under MCS but the Stoves that do not use wood pellets will be under close review. Your system must be metered if you have a boiler or stove and also another system, like an oil boiler.


Check your product

It's not enough to just have one of the types of renewable heating systems that are eligible for the scheme. The make and model must also meet specific technical requirements, check your specific product is in the Product eligibility list. If it's not you need to contact your installer to discuss the next steps.

Northern Ireland Domestic RHI and Energy Efficiency

Because Renewable Heating Systems work best in a well insulated home, the Northern Ireland Domestic RHI wishes to encourage people to make their homes more energy efficient, Before applying to the Domestic RHI you must first:

  • Install loft and cavity wall insulation to current recommended standards. If it is not possible to do this, then you should submit evidence to us as part of your application. 
  • Get an updated EPC to verify your insulation and your renewable heat installation.
If you intend to apply

  • You must be the owner of an eligible heating system.
  • The property must be occupied as a dwelling.
  • Your renewable heating system must be MCS certified.
  • No part of the renewable heating system used to produce heat may be used before the first commissioning date. The date is on your MCS Certificate. Some parts may be exempt.
  • The heating system must have been first commissioned on or after 1st September 2010. The date is on your MCS certificate.
  • You must apply within 12 months of the commissioning date of the heating system, shown on the MCS certificate. The deadline is different if you installed your heating system before the scheme opened. You must apply within the first year, i.e. before 30 November 2015.
  • If you received RHPP (Renewable Heat Premium Payment), DetiNI will make contact with you, so you will not have to do anything.
  • If you received a public grant other than the RHPP you will not be eligible for the NIRHI.
  • To be eligible, you or the former owner must also have made a personal financial contribution to the purchase or installation costs.
Supplying Proof

Your installer will register your renewable heating system and give you the MCS Certificate, to apply you complete an application form found on NI Direct Energy Wise web page you will also need an MCS Installations Certificate and an EPC number. This is at the top of your certificate and is a 20 digit code e.g. 1234-5678-9101-1121-314. Ensure that your EPC includes an estimated Potential Energy Use including figures for heating, hot water and lighting.

Payment Information

For most, payments made on an estimation of your heating system's annual heat use. For Biomass and Heat Pump systems DetiNI take the heat load figure on the EPC. For Solar Thermal, DetiNI use a figure calculated from information on your MCS certificate. Some people will have to install meters and submit regular readings on which payments will be based. This includes, but is not limited to, those with a back-up heating system such as an oil boiler, and those with a property which is a second home.

The domestic RHI payments have two sections, one is an upfront payment to help with the costs on accreditation and an ongoing incentive in the form of annual payment for seven years. The upfront payment is dependant on what technology you're using and the ongoing payment is dependant on how much Energy you use in your home.

The upfront payments are as follows:
  • Biomass - £2500
  • Air Source Heat Pumps - £1700
  • Ground Source Heat Pumps - £3500
  • Solar Thermal -  £320
If you've already received support for under the RHPP you will receive the ongoing payment only. The ongoing payments are calculated by multiplying a tariff with the heat demand/use in your home. The current tariff rates (p/kWh) are as follows;
  • Biomass:                                 5.6 p/kWh
  • Air Source Heat Pump:         3.5 p/kWh
  • Ground Source Heat Pump: 8.2 p/kWh
  • Solar Thermal:                       13.5 p/kWh
Your Responsibilities

A condition of you joining the scheme is that you will abide by the scheme's rules. They include, but are not limited to:
  • Keeping the heating system and metering equipment in good working order
  • Telling DetiNI of the equipment breaks down and isn't working whilst waiting on repairs.
  • Telling DetiNI if you sell your house (with the heating system in it), in which case payments to you will stop and switch to the new owner, should they apply to the scheme and fill certain conditions.
  • Telling DetiNI if you make any changes to your heating system, for example, if you replace a part of it.
  • Telling DetiNI if there are changes that mean your property needs to be metered, for example if you purchase a second home.
  • Telling DetiNI if there is any change in circumstances, that may affect your eligibility to receive payments.
Audit Checks

To continue to receive payments, you'll have to complete an annual declaration confirming that you've kept to the rules. To help protect the public purse, DetiNI carry out a system of desk and site audits to verify that declarations are accurate. They're randomly chosen, so anyone may be selected at any time.

If you've received RHPP in the past when your boiler was installed then you will not be eligible for the subsidized up-front payment the RHPP was a one-off payment to help with covering some of the cost of the boiler. You will still be eligible for the seven year annual payment plan.

For all enquiries regarding NIRHI, call - 02890529219 or Email: NI.RHI@detini.gov.uk
For more information regarding NIRHI please see the following: